The Progress Monitor software is designed to report progress toward a single goal for individual students.If a goal needs to be adjusted, two options exist.
End the current assessment schedule and (if needed) create a new Progress Monitor schedule the new goal.
Use the “New Goal” function within Progress Monitor (insert the icon that looks like a piece of paper with the G on it, within the Progress Monitor calendar of scheduled testing dates), and adjust the goal up or down as needed.
If a “new goal” is needed at a higher or lower grade level than the one at which the student is currently being measured, file the PM schedule away and create a new schedule with the new goal set at the new grade level of material that will be used.